STEP ON IT

Page 1

SEMESTER 4 DETAILING & WORKING DRAWING MODULE - IDS 60804. E PORTFOLIO BEH SUI HUI 0339244


IDS60804 DETAILING AND WORKING DRAWINGS ASSIGNMENT 1

'STEP ON IT'

PREPARED BY: BEH SUI HUI 0339244 BA(HONS) INTERIOR ARCHITECTURE LECTURES: MS NORJI & MS AZIAH









COOK + CLEAN IDS60804 DETAILING AND WORKING DRAWINGS BA(HONS) INTERIOR ARCHITECTURE LECTURES: MS NORJI & MS AZIAH PREPARED BY: BEH SUI HUI 0339244


1.0 INTRODUCTION 1.1 PHOTO TOILET

KITCHEN

KITCHEN

DINING AREA

REFRIGIRATOR

KITCHEN

1.1 DESCRIPTION OF HOUSE TYPE, KITCHEN AND TOILET THIS IS A TWO ROOM DOUBLE STOREY LANDED HOUSE IN MALAYSIA, THIS IS A REPORT FOR WET KITCHEN AND TOILET BESIDES.












4.1 ELECTRIC SYSTEM 850MM (L) X 850MM (W) ONE GANG SP SWITCHED SOCKET

2

850MM (L) X 850MM (W) THREE GANG ONE WAY LIGHT SWITCH

1

850MM (L) X 850MM (W) ONE GANG SP SWITCHED SOCKET

1

850MM (L) X 850MM (W) ONE GANG ONE WAY FLUSH SWITCH

1


4.2 LIGHTING SYSTEM

1200MM (L) LED TUBE LIGHT, 20 W, 1900lm

1

600MM (L) LED TUBE LIGHT, 10 W, 950lm

1

600MM (L) LED TUBE LIGHT, 10 W, 950lm

1


WATERSUPPL Y WATERDI SCHARGE



CONCLUSION LACK OF LIGHTING AT KITCHEN TABLE TOP AREA.

WIDTH OF KITCHEN IS 2.7M FULFILL REQUIREMENT OF UBBL.

LACK OF CHIMNEY AND SMOKE FLUE

DISTANCE BETWEEN SOCKET AND SINK IS LONGER THAN 300MM AND 150MM HEIGHT FROM TABLE TOP.

KITCHEN HEIGHT IS 2.55M, NOT LESS THAN 2.25M, AS STATED IN UBBL.

KITCHEN AREA IS 8.79 SQUARE METRES NOT LESS THAN 4.5 SQUARE METRES, AS STATED IN UBBL.

LOUVERED WINDOW IS BUILT FOR GOOD VENTILATION IN TOILET

KITCHEN

LOUVERED WINDOW PROVIDE GOOD VENTILATION

DISTANCE BETWEEN KITCHEN CABINET AND KITCHEN TABLETOP IS 700MM FULLFILL REQUIREMENTS.

In conclusion, for kitchen part, there is no chimney and smoke flue in my kitchen so cause the bad ventilation in my kitchen. The opening of my louvered window is not larger enough so that smoke and smells accumulate in my kitchen after cooking, should change the window to casement window for wider opening. The material use for my kitchen cabinet is soft maple wood and is not suitable as it is not fire resistance material and it corrosion due to wet environment, especially the one under sink, because sometimes there will have water dropping from pipe so the wood down there already corrode, it can be changed to aluminium cabinet to prevent corrosion issue and aluminium cabinet has smooth area for us to easy clean. Kitchen cabinet door should apply auto soft close hinges to avoid slam door and extend the life span of door. For lighting part, there is not bright enough at kitchen top area, led tube light can be put under the hanging cabinet to brighten kitchen table top area. Besides that, there is not enough working place at kitchen, the length of kitchen table top should extend to a certain length. A door should be built at the enter of kitchen to prevent the smoke spread to living room area. Lack of dishwasher, as the size of kitchen sink is not big enough for us to wash huge amount of bowl. The type of sink tape only can turn direction but can't pull out, sometimes is hard for us to clean the sink, spring pull-out kitchen tap is needed for more convenience. From the picture we can see that my kitchen splashbacks are tiles, and have grouts that will accumulate dirty and bacterial, so it is better change the splashbacks to glass splashbacks. Other than that, my kitchen has good flooring tiles in matte finish to prevent slippery. Suitable positioning of electric socket.

MATERIAL OF KITCHEN CABINET IS NOT FIRE RESISTANCE MATERIAL

TOILET

For the toilet part, the ventilation is not that good as it only has a small louvered window, a boost fan can be given to the window to improve ventilation problem. Besides that, my basin is placed outside the toilet, it is a bit inconvenience that after using toilet we need to go out to wash our hand, there's still a empty place in my toilet and the basin should move inside. A bidet hose can be installed beside the toilet bowl. The flooring tiles in toilet are in matte finish so it prevent slippery as the floor of toilet is usually wet, and the wall of toilet area is smooth surface tiles, easy to clean.


R E F L E CT I O N FROM THI SPROJ ECT ,IFEELQUI TECHALLENGI NG THATNEED TO PROVI DE FULLKI TCHEN AND TOI LETDRAWI NG,BUTIREALI ZETHATIMORE FAMI LI ARWI TH LI NEWEI GHTAND TECHNI CALSKI LLAFTERDI D FI RSTAND SECOND PROJ ECT ,AND LEARN WAYHOW TO MEASURELARGEDI MENSI ON AND THI SI SMYFI SRTTI MERESEARCH ABOUTTHEPI PI NG SYSTEM OF TOI LETBOWLAND SI NK,AFTERDONEEVERYTHI NG IFEELVERYSATI SFY THATIMAKEI T ,IDONEAFULLREPORT .


ASSIGNMENT 3 BACHELOR (HONS) IN INTERIOR ARCHITECTURE IDS60804 DETAILING AND WORKING DRAWINGS LECTURES: MS NORJI & MS AZIAH PREPARED BY: BEH SUI HUI 0339244
















DRAWING LIST ITEM

DRAWING

1 2 3 4.1 4.2 4.3 5 6 7 8 9 10 11

GENERAL ARRANGEMENT FINISHES SCHEDULE EXISTING STRUCTURE PLAN ADDITION & DEMOLITION PLAN FURNITURE LAYOUT PLAN HOARDING LAYOUT PLAN HOARDING VISUAL M&E PLAN REFLECTED CEILING PLAN AIR CONDITION DUCTING PLAN FIRE SPRINKLER PLAN FLOOR FINISHES PLAN WALL FINISHES PLAN PLUMBING PLAN

12 13 14 15 14 15 14

ELEVATION / SECTIONAL ELEVATION ELEVATION 1.1 - SHOPFRONT & SIDE ELEVATION ELEVATION 1.2 - SHOPFRONT SECTION A-A ELEVATION 2 - SHOPFRONT REAR ELEVATIO 3 - DOUBLE VOLUME ELEVATION 4 - INTERNAL 1 ELEVATION 5 - INTERNAL 2 ELEVATION 6 - CASHIER AND CONSULTATION

15 16 17 18 19

FURNITURE DETAIL FURNITURE DETAIL 1 - ISLAND 1 FURNITURE DETAIL 2 - ISLAND 2 FURNITURE DETAIL 3 - SERVICE TABLE FURNITURE DETAIL 4 - LOW CABINET FURNITURE DETAIL 5 - SPECIAL DISPLAY CABINET


PARTIES INVOLVED INTERIOR ARCHITECTURE SHERLYN Sdn Bhd 5, Jalan Merah 23, Taman Moust Austin, 81100 Johor Bahru, Johor. T : +601116191191 E : Sherlynbeh0601@gmail.com

Interior architects interact with clients to identify their needs and create interior spaces accordingly. They create designs for all aspects of an interior space, such as doors, windows, walls, and furnishings.

COST CONSULTANT MRQS COST CONSULTANCT Sdn Bhd No 7, Jalan Sejahtera 11 Taman Desa Skudai 81300 Johor Bahru, Johor. T : +6075953657 E : mr.qs.jb@gmail.com

STRUCTURE ENGINEER & ARCHITECTURE RELIACON Sdn Bhd 25, Jalan Bayu Puteri 1/3, Taman Bayu Puteri, 80150 Johor Bahru, Johor T : +6073318892 E : admin@reliacon.my

SITE INSPECTOR HOME INSPECTION Sdn Bhd 25.03A, Level 25, JBCC Office Tower, 106-108, Jalan Wong Ah Fook, 81100 Johor Bahru, Johor T : +60376517878 E : ask@homeinspection.my

The cost consultant provides estimates, and advice regarding the cost of construction works. The cost consultant's role might include: Helping determine the client's requirements and undertaking feasibility studies.

The architectural consultant provides professional planning, design, construction management, and budgeting services for capital construction projects including new structures, additions, alterations, and repair of State facilities. Structural engineers are primarily concerned with designing and constructing buildings and structures that are safe and capable of withstanding the elements to which they will be exposed, as well as improving the structural integrity of existing buildings. Site inspectors monitor all work carried out on a construction site to ensure safety and quality standards are upheld. They make sure that building plans and specifications are being followed correctly and manage staff and subcontractors on building sites.


UBBL RULES EXIT DOORS 173.(1) ALL EXIT DOORS ARE OPENABLE FROM THE INSIDE WITHOUT THE USE OF KEY OR ANY SPECIAL KNOWLEDGE. 173.(2) EXIT DOORS ARE CLOSE AUTOMATICALLY WHEN RELEASED AND ALL DOOR DEVICES INCLUDING MAGNETIC HOLDERS, RELEASE THE DOORS UPON POWER FAILURE OR ACTUATION OF THE FIRE ALARM.

VENTILATION 39(1) BY FOLLOWING UBBL RULE EVERY ROOM DESIGNED, ADAPTED OR USED FOR RESIDENTIAL, BUSINESS OR OTHER PURPOSES EXCEPT HOSPITALS AND SCHOOLS SHALL BE PROVIDED WITH NATURAL LIGHTING AND NATURAL VENTILATION BY MEANS OF ONE OR MORE WINDOWS HAVING A TOTAL AREA OF NOT·LESS THAN 10% OF THE CLEAR FLOOR AREA OF SUCH ROOM AND SHALL HAVE OPENINGS CAPABLE OF ALLOWING A FREE UNINTERRUPTED PASSAGE OF AIR OF NOT LESS THAN 5% OF SUCH FLOOR AREA. MARKET AREA DID INCLUDE MORE WINDOWS HAVING TOTAL AREA OF NOT LESS THAN 10% OF THE CLEAR FLOOR AREA.

HEIGHT OF SHOPHOUSE 44.(3) THE HEIGHT OF GROUNF FLOOR IS 3500MM AND 3800 FOR UPPER FLOOR BY FOLLOW THE UBBL RULES THAT IN SHOPHOUSES THE HEIGHT OF GROUND FLOOR ROOMS SHALL BE NOT LESS THAN 3 METRES AND THE HEIGHT OF UPPER FLOOR ROOMS SHALL BE NOT LESS THAN 2.5 METRES.

WALL AND FLOOR MATERIAL USED 203.(2) ALL MATERIAL USED FOR FLOOR AND WALL ARE APPROPRIATE AND PREVENT FLAME SPREAD BY FOLLOWING UBBL RULE MANTION THAT THE CLASSIFICATION OF INTERIOR FINISH MAT.ERIALS SPECIFIED SHALL BE THAT OF THE BASIC MATERIAL USED, WITHOUT REGARD TO SUBSEQUENTLY APPLIED PAINT OR WALL-PAPER, EXCEPT THAT THE FIRE AUTHORITY HAVING JURISDICTION SHALL INCLUDE SUCH FINISHES IN THE DETERMINATION OF CLASSIFICATION IN ANY CASE WHERE IN THE OPINION OF THE FIRE AUTHORITY HAVING JURISDICTION THEY ARE OF SUCH CHARACTER OR THICKNESS OR SO APPLIED AS TO AFFECT MATERIALLY THE FLAME SPREAD CHARACTERISTICS.

TIMBER FLOORING 44103.(1) ALL TIMBER FLOORING ARE TREATED WITH A SUITABLE WOOD PRESERVATIVE BY FOLLOWING UBBL RULE MENTION THATWHERE STRUCTURAL TIMBER FLOORS ARE PERMISSIBLE UNDER THESE BY-LAWS THEY SHALL BE DESIGNED OF HARDWOOD OR OF SPECIES OF TIMBER TREATED WITH A SUITABLE WOOD PRESERVATIVE.


CONCLUSION THIS IS MY VERY FRIST TIME WORKING ON A FULL DRAWING LIST, AND FINALLY GET TO KNOW MORE KNOWLEDGE ON WORKING DRAWING LIST AND PARTIES INVOLVED. I'M SO GLAD THAT UNDER THE HELPS OF LECTURES I ABLE TO FINISH THESE DRAWINGS, ALTHOUGTH AT FIRST I'M QUITE CONFUSE ON CERTAIN DRAWINGS SUCH AS REFELCTED CEILING PLAN, WATER SUPPLY AND BQ, BUT I DISCUSS WITH FRIENDS AND FIGURE OUT THE WAY TO COMPLETE IT. FINALLY IT IS THE LAST PROJECT OF DWD MODULE AND I'VE LEARN A LOT OF TECHNICAL DRAWING SKILLS THROUGH OUT THIS MODULE AND MORE CONFIDENCE FOR MY INTERNSHIP, HOPE THAT I CAN APPLY THE KNOWLEDGE THAT I'VE LEARNED FOR THIS MODULE DURING MY INTERNSHIP. I LIKE THIS MODULE VERY MUCH AND HAS MORE UNDERSTANDING ON UBBLRULES AND MORE...


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.